Unit Descriptor:
Terms and details of the project:
The address and details of the parties to the contract in the project
The total project Price
A description of the project to be undertaken
Building Regulation
Application of the Unit
Site Manager:
Foreman:
Estimator:
Project Manager:
Construction Builder:
Licensing/Regulatory Information:
- Specification and project plan for the building project.
- Starting date and finishing dates of the building project based on the contract singed by both parties.
- Insurance against building which should comply with the building laws against risk.
Pre-requisities
Pre-requisities: Nil
Employability Skill Information:
Site Manager: Degree in Civil Engineering with 10-12 years of experience
Foreman: Diploma in Civil Engineering with 8-10 years of experience
Estimator: Degree in Civil Engineering with 10-12 years of experience
Project Manager: Degree in Civil Engineering with 15-20 years of experience
Construction Builder: Should have experience in building construction for 15-20 years.
Elements and Performance Criteria:
Contractual Requirement:
Local Government and regulatory Bodies for the approval of the schedule:
Schedule include color selection
Variations to contracts, raised by the client or the builder, are included in the schedules.
Produce material and labour schedules, overlays and orders.
Sl. No. | Item | Unit Price | Quantity | Rate |
1 | Face Bricks | |||
2 | Common | |||
3 | Mortar | |||
4 | Flashing | |||
5 | Venner Tiles | |||
6 | Lintels | |||
7 | Painting |
Job cost Analysis Sheet:
Sl. No. | Item | Estimated Price | Actual Price | Variance |
1 | Face Bricks | |||
2 | Common | |||
3 | Mortar | |||
4 | Flashing | |||
5 | Venner Tiles | |||
6 | Lintels | |||
7 | Painting | |||
8 | False Ceiling | |||
9 | Plumbing (pipes and Pipe Fitting) | |||
10 | Electrical Equipments | |||
11 | AC |
Painting Scheme:
Room Type | Paint Manufacturer | Area | Paint Type | Finishes |
Room 1 | ||||
Room 2 | ||||
Room 3 | ||||
Room 4 | ||||
Room 5 |
Door Schedule:
Room Type | Size | Door Type | Quantity | Manufacturer |
Room 1 | ||||
Room 2 | ||||
Room 3 | ||||
Room 4 | ||||
Room 5 |
Unit Room Labour Schedule:
Sl. No. | Details | Unit | Quantity | Rate | Total Cost |
1 | Supply of Bricks | ||||
2 | Delivery | ||||
3 | Brick Laying | ||||
4 | Mortar Mix 20 kg with 10% wastage | ||||
5 | Venner Tiles, 2.5 tiles per m2 | ||||
6 | Bar Bending upto 8 mm | ||||
7 | Bar Bending 8-16 mm | ||||
8 | Bar Bending 20 mm | ||||
9 | Plastering | ||||
10 | Painting | ||||
11 | Lintels | ||||
12 | False Ceilling | ||||
13 | Plumbing per Meter | ||||
14 | Electrical | ||||
15 | AC Fitting per Room |
REQUIRED SKILLS AND KNOWLEDGE
- Communicate information effectively within the organisation and to external agencies and the client
- Read and interpret: contracts and drawings and specifications
- Use language and concepts appropriate to cultural differences
- Use and interpret non-verbal communication
- Written skills to: prepare and maintain site files and produce schedules and orders
- Identify and analyse relevant information
- Numeracy skills to apply calculations.
Required knowledge
Required knowledge for this unit is:
- operation and structure of the organisation’s costing and contracting system
- state or territory building and construction codes, standards and regulations relevant to the form of building or construction being undertaken
- types of building or construction drawings and specifications commonly used in the industry
- types, scope and usage of labour through the employee and contractor systems.
Evaluation evidence process:
- identify materials required for the project and gather supply information effectively
- plan and allocate human and physical resources
- produce documentation that meets the time frames and quality standards established by the organization
- communicate information effectively within the organization and to external agencies and the client, as required.
- Construction as per the 2D AutoCAD drawing.
- competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
CPCCBC4018A Site Survey Plan
Site survey plan is the most important factor for the start of the project.
Checking of Level:
On the ground, two points A and B are marked a distance of approximately 50 meters apart. In sandy soil two pegs are used, on hard surfaces nails or paint may be used.
The level is set up half way between the two points and carefully levelled. A leveling staff is placed at Peg A and a staff reading is taken then the level is placed on Peg B and a reading is taken.
Figure 1: Reading at Mid Point
Figure 2: 4 meter behind Point B
The reading as follows
Reading and instrument location | Point A staff reading 1 | Pint B Staff reading 2 | Difference |
Reading 1 at the mid point | |||
Reading 2 4m behind the point A or B |
Points to be Considered while taking the calibration reading?
- The two test point should be 40m apart.
- Use of spray to mark the points.
- Use of peg on hard surface or grass.
- Check the difference between the two readings and check both the readings are same or not.
Non Complaince Report
Project Information:
Site Address | Project Code | Tender Reference No | Project ID |
Contractor Information:
Location | Person In-charge | Phone | |
Site Engineer Information:
Location | Person In-charge | Phone | |
Non Confirmation Details:
Description of Non Confirmation:
Photos and Videos:
Non Conformity Category:
Recommendation by Orginator:
Question:
Originator Signature:
Contractor Signature:
Outcome of the investigation:
OHS Policy:
Task | Potential Hazard | Risk Rating | Control Measures |
General Activity | Natural Disaster | 3 | PPE Hand Gloves Observe Warning |
General Activity | Transmission Tower | 2 | Observe Safety Precution Education and Awareness |
General Activity | Wellness | 4 | Health and well being |
Travel to and from Work | Traffic | 1 | Observe PPE Traffic Control |
Site Establishment | Theft of Property ot Vehicle | 4 | Observe Secure all property and vehicle Invlove Police |
Survey Field Work | Site Induction | 3 | Determine and contact the site manager and the site instruction |
Survey Filed Work | Electrical, Water Asset, Explosion | 2 | Observe Asset Plan Location DBYD |
Mark Placement | Tools and tackels | 1 | PPE AMC |