Project management essay on: “The great escape”
RISK ANALYSIS
Risk Identification for “The Great Escape”
Through the review of the previous objects and the metrics eth starting point for risk identification is found. In the camp it was mainly based on keeping the track of metrics related to the attempts made for escaping and doing a serious post-mortem after each escape attempt without considering whether it has failed or was successful. Some of the areas of risk identified in “The Great Escape” Movies are:
- Escape plot discovery through the presence of tunnels. This major risk lied in the detection of the whole escape project if the traces of tunnel were badly hidden or the tunnel traces were exposed and nosy ferrets uncovering something.
- Dangers of Tunnel Engineering: the potential risk was of risk of lives for the men who were digging tunnel because the tunnel might collapse or the construction was very risky job. Due to very small dimension of tunnel the accumulation of bad air was possible.
- The third area of risk was the escape itself because getting through and out of the tunnel which was very sleek in dimension was risky as it posed the risk of collapsing anytime. Another risk of escape was the life the men would have to handle after getting outside and being on the run because survival was a major challenge till eth reached safe destination.
Risk Management Plan
The Risk analysis can be both qualitative as well as quantitative the qualitative risk analysis is developed by combining the probability of occurrence and impact while the quantitative risk analysis analyses the risk numerically and its effects on all the project objectives of the risks identified.
The first risk was escape plot being discovered and in this case the biggest risk was that the tunnel getting discovered. The most likely part of the deep tunnel to be discovered was its trap door. The probability of discovering the tunnel trap door was “very high” because the nosy ferrets were looking for it all the time. The impact of detecting it was catastrophic. SO the risk could be managed by concealing the single entrance door to the tunnel to avoid closest of scrutiny.
Nosy Ferrets were also very high risk because of unrestricted access; they can uncover anything and wander anywhere. Thus the probability of tunnel discovery is very high. The impact of this risk was that all the escape-related work should be highly guarded and eth Prisoners of Wars should be alerted immediately about the arrival of nosy ferrets.
Hiding the traces of tunnel mainly the sand was “low risk”. The probability of sand’s discovery was “high” because it is hard to conceal sand as its colour was different from the outside sand. The impact of discovering dug sand was the ferrets getting alerted that an escape tunnel is being built. The probability of discovering the sand was “high” because massive digging was needed for the long tunnel and concealing huge amount of sand was difficult.
Second Risk Management
The second risk was danger associated with tunnel engineering because eth probability of tunnel collapsing was “very high” and cave-ins were common feature. The impact of tunnel collapse was “higher” for the men working inside tunnel.
The probability of bad air accumulating was “very high” because it increased with the tunnel growing in length. The impact of bad air will lead to saturation of carbon dioxide which could lead to congestion or asphyxiation and can also lead to death. This risk can be managed by applying the best possible techniques like air supplier machine being prepared by Hendrick and allowing entry of few people in tunnel at a time.
Thus the risk was well managed through:
First risk escape plot discovery:
- Concealing the trap door to tunnel through blending them with the surroundings of room this way risk was mitigated.
- System of tracking and warning system was developed for avoiding the ferrets. The dangerous ferrets list was maintained by Bushell.
- To mitigate the risk of discovery of tunnel three tunnels were constructed together so that if one was discovered they can fall back on another tunnel.
- Concealing the traces of tunnel by dispersing sand outside through concealed pockets and various cover-up activities was planned like choir singing to conceal the tunnel digging sound.
Second risk Dangers with tunnel engineering:
- The expertise of miners and mining engineers like Wally Floody etc. helped in mitigating this risk.
- The risk of tunnel collapse was mitigated through ensuring that the tunnels were levelled.
- The ventilation system was installed to bring air to the tunnel’s face and help in mitigating the risk of suffocation.
Third Risk The escape itself:
Disguise clothing, identification passes etc. For everyone was stitched so that they can move around freely after escape and mitigate the risk of getting away from the camp unnoticed.
- The risk of escaping through the tunnel without getting noticed was done by passing the escapers through careful controlling.
A Quality Management Plan
The quality was managed for the Escape Plan through taking care of each and every detail of the activity like:
- Concealing the tunnel entrance: It was done with great nitty gritty and engineering. Two similar tiles were being sourced matching the floor which can be removed and fitted back. The trap door was perfectly blended with the surroundings of the room.
- Tunnel construction was done secretly and safely: To conceal the digging sounds the chorus was made to sing whenever the digging activity was done. The sand was taken outside and mixed with the sand through concealed pockets with strings and then mixed through foot stomping of parading men or the men who were gardening so that it cannot be noticed. The escape activity was not totally concealed because then it would have created suspicion in the minds of ferrets and higher officials.
- Forged Documents were scrutinised: Once Henderly took the real documents from one of the ferrets he created two documents and asked the caption which one is forged even he could not detect.
- Clothing – meld wearer, the clothing was dyed with blue ink so that it can get the same colour. The blanket cloth was scrapped to make it smooth so that it gets the same look and feel as the ferret’s dresses. The cuts and eth design of clothing was also totally imitated as the German soldiers or common man to make them perfect disguise.
A Resourcing Plan
The resource plan was close to perfect as designed by the escape team the escape committee created the project teams in order to overcome the various problems on the basis of various available skill sets. Which has been depicted in the chart below the resource plan?
If you want Project management Assignment Help study samples to help you write professional custom essay’s and essay writing help.
Receive assured help from our talented and expert writers! Did you buy assignment and assignment writing services from our experts in a very affordable price.
To get more information, please contact us or visit www.myassignmenthelp.Com